4 |
The Mærsk Gallant has been working in the North Sea since its commissioning in 1993. 98 persons in two-man rooms, and 22 in 1 man rooms, all with full facilities. The Mærsk Gallant is one of the ultra harsh environment jack-ups in Maersk Drilling’s fleet.
The rig is designed for year-round operation in the North Sea, in water depths up to 120 m (394 ft) with an available leg length below hull of 138.5 m (454 ft). The water depth capability can be increased to 125 m (410 ft) through installation of spudcan extensions. The rig is fully equipped for high pressure/high temperature drilling (HP/HT). More Information
Food |
3 |
Cleanliness |
4 |
Internet |
4 |
Recreation Room(s) |
3 |
Cabins |
5 |
Bond |
5 |
Gym |
4 |
Total Ratings: 1 |
Good food, decent internet all around the accommodation. About 5 quid for a pack of cigarettes. Rooms are spacious, it’s 2 single bed rather than bunk beds.
Nam sem dolor, condimentum a orci non, vestibulum gravida velit. Vestibulum mollis lobortis est vitae efficitur. Proin elementum ac nisl et commodo. Integer ut justo quam.
Test review to test everything. Duis pharetra vehicula ex, aliquet convallis sapien faucibus ut. Integer condimentum arcu quis eros iaculis, a tincidunt purus tempus. Proin quis elit felis.
This is a test rating review
Shit mate
Lorem Ipsum