Exit Menu
Platforms   >   CNR   >   Ninian South

3


CNR International operates the Ninian Southern Platform (NSP) which is located in the northern North Sea, 240 miles north of Aberdeen, one of three platforms operate by the company in the Ninian Field. Installed in 1977, the original design life for NSP was 30 years; however current Life of Field projections are likely to require it produces for an additional 25 years.

 

 



Food

3.5

Cleanliness

4

Internet

1.5

Recreation Room(s)

2.5

Cabins

3.5

Bond

1.5

Gym

4


Total Ratings: 4


Reviews

Photo and Image Files
 
 
 
Audio and Video Files
 
 
 
Other File Types
 
 
 


Ad Space